Oversite prepared

Orangery baseBrickwork up to D.P.C. and oversite prepared. The hardcore is compacted and blinded with soft sand to protect the damp proof membrane.

The drain inspection chamber will need to remain in place, it’s 1500mm deep and on the main run servicing a row of several properties.