Orangery foundations

orangery foundations

orangery foundations

Just started digging, the house footings are about one metre deep, but the building inspector says we need to go to 1.3 m and widen the bottom of the trench to 600mm to account for the sandy soil.

Ironically, we will probably use several hundred pounds worth of sand on this job, but the stuff in the ground isn’t suitable. Never mind, we might strike gold on the next job!