Orangery fascia complete

orangery hertfordshire

orangery fascia

The decorative fascia is fitted and the Sarnafil roof finished. This needs to be prepared before the glazed lantern can be installed. The hardwood windows, doors and lantern are just being delivered to site.

We are making the most of the good weather by pushing ahead with the electrics. Michael, the electrician, is running the cables for some outside lights. He has already installed the wiring for the recessed spotlights inside the lantern roof. These positions are pre-planned so the spotlights don’t conflict with the timber joists.